We oversee real projects involving residential renovations and commercial fit-outs, ensuring full project control, proper sequencing, and high-quality delivery.
With exposure to over $100 million worth of construction and fit-out projects, including both commercial fit-outs and residential renovations, TKM brings real-world experience into every job. These projects showcase our commitment to project control, demonstrating how we effectively manage, control, and deliver work with structure, accountability, and clear outcomes from start to finish.
This kitchen renovation, part of our broader residential renovations service, involved a full strip-out of the existing space while retaining the existing flooring. This required strong project control, with a focus on protection and controlled execution from the start.
All services were disconnected and made safe prior to demolition, and full site protection was installed across floors and surrounding areas to prevent any damage during the works. Maintaining the existing floor meant every stage had to be carried out with precision.
The project was run on tight sequencing and programming, coordinating demolition, rough-ins, cabinetry, and fit-off trades in a controlled flow. Each trade was scheduled correctly to avoid overlap, delays, or disruption, reflecting our expertise in managing commercial fit-outs.
Trade management and quality control were maintained throughout, with every stage checked before progressing. This ensured no work was rushed, missed, or required rework.
The project was delivered smoothly with a zero defect result, no damage to existing finishes, and a high-quality final outcome. The client was extremely satisfied with both the process and the finish.
This residential renovation involved a full strip-out of the existing bathroom and laundry, incorporating key layout changes such as rerouting the toilet, relocating the basin, and upgrading all tapware while retaining the existing bathtub.
The demolition was carried out in a controlled manner, followed by re-plastering and preparation for new finishes. A major focus on this project was waterproofing, with all works completed by a certified contractor and backed by proper compliance certificates to ensure long-term performance, reflecting our commitment to project control.
To achieve a clean, modern finish, a concealed in-wall cistern system was installed alongside updated fixtures, fittings, and a refined layout that improved both functionality and appearance—key considerations in our approach to commercial fit-outs.
All trades were coordinated closely to maintain workflow and ensure each stage was completed correctly before progressing. Particular attention was given to alignment, levels, and finishes, resulting in a clean, straight, and well-executed outcome.
The project was completed in approximately two weeks, delivered efficiently without delays, and handed over with a high-quality finish. The client was extremely satisfied with both the transformation and the overall process.
This project centered on a full kitchen transformation as part of a larger internal renovation, necessitating strong project control and coordination across multiple trades and services. The layout was reworked to create a larger, more functional kitchen with improved flow and increased bench space, a crucial aspect of residential renovations.
An oversized island and a secondary island were introduced, featuring dual sinks to enhance usability. The kitchen was upgraded with a five-burner gas cooktop, an internally mounted microwave, and new appliances, all of which required significant plumbing and electrical adjustments.
Service coordination was a vital component, with pipework modifications and electrical upgrades meticulously planned to ensure everything aligned correctly without delays or rework, a key factor in successful commercial fit-outs.
A minor delay in cabinetry materials was managed by progressing other trades in sequence, maintaining momentum and avoiding downtime on-site.
Completed in approximately four to four and a half weeks, the project was delivered with a zero defect outcome, fully certified and approved. The client was extremely satisfied with the final result, which significantly improved both functionality and overall finish.
This project focused on rectifying and upgrading an existing lounge area as part of our commercial fit-outs, addressing minor defects while enhancing the overall finish and presentation of the space.
The works included re-plastering walls, repainting, replacing flooring, and modifying window sections, which involved re-framing and updating glass to improve both structure and appearance.
The job required a clean, efficient approach to project control, coordinating trades to complete the renovations quickly without disrupting surrounding areas. All tasks were scheduled tightly to ensure a smooth flow from preparation through to final finishes.
Attention to detail was key, particularly with plastering and painting, to ensure all surfaces were straight, clean, and consistent across the space. The flooring installation was completed to align with the updated layout and finishes.
The project was completed within one week, delivered efficiently with no issues, and handed over with a clean, refreshed result. All trades were aligned, and the outcome met expectations with a noticeable improvement in both quality and finish, exemplifying our commitment to excellence in residential renovations.
Delivered within a premium CBD environment, this commercial fit-out project involved a full office fit-out alongside a reputable builder and experienced project team. Works included the demolition of the existing ceiling grid while retaining the exposed roof structure, requiring careful coordination across all services and finishes.
The build involved the integration of mechanical, fire, ventilation, lighting, and workstation installations, all managed within a structured programme focused on project control. TKM coordinated site activity, trade sequencing, and workflow across all stages.
Despite material lead time delays, progress was maintained by keeping trades active and efficiently sequencing works, ensuring the programme stayed on track.
The project was completed one week ahead of schedule, allowing time for defect rectification and final quality checks before handover.
Supported by strong architectural and engineering documentation, the project was delivered with zero incidents and zero defects, fully compliant and certified. The final result was a high-quality, well-controlled fit-out that met both design and operational requirements, showcasing expertise akin to that found in residential renovations.
Delivered within an active retail environment, this commercial fit-out project required a staged approach to allow trading to continue while works were carried out. The build was split into Stage 1 and Stage 2, with stock relocated and areas fully hoarded and protected.
Works included full demolition, replacement of the shopfront and glazing, new framing, bulkheads, lighting, plastering, joinery, and flooring. Each stage was carefully sequenced under strict project control to ensure trades worked efficiently within the restricted environment.
Access, deliveries, and logistics were tightly managed in coordination with building management and security, ensuring smooth operation throughout. Night works were also carried out where required to maintain progress and minimize disruption.
Completed over approximately eight weeks, the project was delivered in a controlled and staged manner, achieving a high-quality finish and a strong outcome for both client and project team, similar to those seen in successful residential renovations.
Delivered within a live supermarket environment, this commercial fit-out project required strict control over safety, staging, and programme to ensure works were completed without disrupting daily operations.
The refurbishment involved flooring upgrades, electrical works, architectural modifications, and full coordination across services, all carried out while the store remained operational. Managing trade movement, public safety, and site access was critical throughout.
A strong focus was placed on project control through sequencing and programming, ensuring each stage was planned and executed in a controlled manner. Trades were coordinated closely to maintain progress while working within restricted zones and live conditions.
Ongoing communication with the client team and project stakeholders ensured alignment at every stage, allowing issues to be addressed quickly and keeping the project on track.
The project was delivered safely, on programme, and to a high standard, with all works completed under controlled conditions and with strong coordination across all teams, showcasing the expertise required not only in commercial fit-outs but also in managing a complex environment akin to residential renovations.
Delivered within a medical environment, this commercial fit-out project required a high level of compliance, precision, and controlled execution across all stages. Every element of the build had to meet strict standards, with no room for error.
Works included detailed coordination of services, specialist equipment integration, joinery, lighting, flooring, and finishes, all installed to align with medical and operational requirements. Clean and accurate installation was essential to ensure long-term performance.
A strong focus was placed on documentation, certification, and compliance, ensuring all works were completed in line with required standards and properly signed off. Project control was maintained through ongoing coordination between trades, consultants, and stakeholders to ensure nothing was missed.
Attention to detail was carried through to all finishes, delivering a clean, precise outcome across the space. The project was completed fully compliant, certified, and to a high standard, meeting both design intent and operational requirements, much like in residential renovations.
Delivered under a fast-tracked programme, this commercial fit-out project was completed over approximately 10 weeks and structured across three key stages to maintain project control and keep works progressing efficiently.
Staging was critical, allowing different zones to be completed in sequence while maintaining workflow across all trades and avoiding congestion or delays. The scope included full coordination of services such as electrical, mechanical, and associated engineering works, all delivered in line with programme and design.
Strong alignment between trades, consultants, and the builder ensured smooth execution throughout. Programming and sequencing were tightly managed, keeping trades moving and maintaining momentum on site.
Safety and compliance were upheld across all stages, ensuring efficient operation under pressure. Working alongside a reputable builder and experienced team, the project was delivered on programme with a high-quality finish and a well-coordinated outcome, demonstrating excellence in both commercial fit-outs and residential renovations.
TKM PROJECT CONTROL
Melbourne VIC, Australia